How the paver math works
A paver patio is three layers, and only one of them shows. At the bottom is a compacted base of crushed stone, the layer that decides whether the patio is still flat in ten years. On top of that goes a nominal 1 inch of loose concrete sand, screeded level, and then the pavers themselves, which for patios, walkways, and home driveways are 2 3/8 in (60 mm) thick. Those are the Interlocking Concrete Pavement Institute's construction guidelines, now published by the Concrete Masonry and Hardscapes Association, and every quantity on this page follows from them.
The paver count starts with a quirk of the trade: pavers are sold by nominal size. Belgard lists its Holland Stone as 4 x 8 x 2 3/8 in, and laid with the standard 1/8 in joint each one takes exactly 32 square inches of ground, which is 4.5 pavers per square foot. So for the sizes in the list we treat the nominal size as the paver plus its joint. Choose a wider joint and we add the difference; enter a custom size and we add your whole joint to the paver's actual measurements.
The formula
base area = paver area + 6 in past every free edge
base tons = base area × (base depth ÷ 12) ÷ 27 × 3,700 ÷ 2,000
bedding sand = area × (1 ÷ 12) cu ft
Area is in square feet. The 144 turns square inches into square feet. Waste is the allowance for cut and broken pavers. Base depth is in inches, compacted, and dividing cubic feet by 27 gives cubic yards. The 3,700 is the weight in pounds of a cubic yard of crushed base course once it is compacted, from the Washington State DOT's estimating tables, and dividing by 2,000 gives tons.
Worked example
A 16 by 12 ft patio in 4 x 8 in pavers, 1/8 in joints, laid in running bond, on well-drained soil. The area is 192 sq ft with 56 ft of edge. At 4.5 pavers per square foot that is 864 pavers exactly, and 5% extra for cuts makes 907.2, so you buy 908 pavers.
The base is ICPI's 4 in minimum for a patio, and it runs 6 in past every edge, so it covers 17 by 13 ft, or 221 sq ft. That is 73.67 cu ft, or 2.73 cu yd compacted, which weighs 5.05 tons: order 5.1 tons, or 3.7 cu yd if your supplier sells by the yard. Add 0.59 cu yd of bedding sand (about 0.8 tons), 3 bags of polymeric sand, and 56 ft of edge restraint. You dig 4 + 1 + 2 3/8 = 7 3/8 in deep, which lifts out about 5.03 cu yd of soil as it sits in the ground.
Tons or yards: why the gravel pile is bigger than the hole
Crushed base stone is sold two ways, and they are not the same question. Loose, the way it comes off the quarry's scale, it weighs about 2,800 lb per cubic yard: that is the figure Luck Stone's own tonnage calculator uses, and Rogers Group orders at the same 1.4 tons. Compacted on the job, the same stone weighs 3,700 lb per cubic yard, the figure both the Washington and Wisconsin DOTs work with. Tons do not change when you run a plate compactor over them, so if you order by the ton and work out tons from the compacted volume, the compaction is already counted. Order by the yard and you need about a third more yards than the hole, a compaction factor of 1.32, because a loose yard packs down to about three quarters of a yard.
We should be honest about that third, because the published figures do not agree exactly. Washington State's DOT gives the same base course 2,950 lb per yard at truck measure, a settled load, which would make the factor only 1.25. A 2023 study for the Wisconsin DOT measured dense-graded base at 1.80 to 1.86 tons per compacted cubic yard, which brackets 1.85 nicely, and found it swelling by 34% to 47% between compacted and a loose stockpile. Our 1.32 sits between the settled truck and the fluffy stockpile, so if a supplier measures yards by the loader bucket, you may need a little more. It is the main reason to order base stone by the ton whenever you can. Our gravel calculator uses the same figures for road base, so the two pages give the same answer.
Bedding sand is different: it is screeded to a nominal inch and left loose until the pavers go down, so we weigh it as loose sand, 2,600 lb per cubic yard (Rogers Group's 1.3 tons), not as compacted fill.
How deep the base goes, and why driveways need more
ICPI's minimum is 4 in of compacted base for patios and walkways and 6 in for residential driveways, both on well-drained soil, and it asks for 2 to 4 in more in colder climates and on soil that stays wet or is weak. The same paver sits on top either way; what changes is how far a tire's load has to spread before it reaches the dirt. Belgard's installation guide sets 8 in as its minimum dig for a patio, which leaves room for a thicker base than the 7 3/8 in the layers strictly need, and the extra only ever helps.
Compaction matters as much as depth. ICPI has the base spread and compacted in lifts of 4 to 6 in with a 7,000 pound-force plate compactor, and thinner lifts with the lighter plates most rental shops carry, so a 6 in base usually goes down as two or three lifts rather than one. The base should also extend past the pavers: Belgard's guide over-digs at least 6 in beyond the edge, which is why the base on this page always covers more ground than the pavers do.
Joints, patterns, and the sand you sweep in
Concrete pavers are made to sit with a joint of 1/16 to 3/16 in, and most have small spacer bars cast on their sides to hold it. The joint looks like nothing, but it adds up: with 1/8 in joints, the gaps are 4.6% of a 4 x 8 patio's surface and only 1.0% of a patio in 24 x 24 slabs. That is why polymeric sand bags print coverage as a range (one maker's chart says 65 to 85 sq ft per 50 lb bag for narrow joints on 2 3/8 in pavers), and why small pavers sit at the low end of it. We use the low end unless you enter your own bag's figure, and fill to 1/8 in below the paver top, as the makers ask.
The cut allowance is our own editorial convention, not a published standard: 5% for straight patterns, 10% for 90 degree herringbone, and 15% for 45 degree herringbone or any diagonal layout, where every edge paver gets cut at an angle. Herringbone earns its extra cuts on a driveway, where ICPI recommends it for streets because the pavers lock together against starting, braking, and turning tires. Whatever you choose, buy every paver from the same production run, since color can shift between batches. If you are hauling away the soil you dig out, our dumpster size calculator takes it from there, and the square footage calculator handles odd-shaped areas.