Dumpster Size Calculator

Pick your project and you get a specific dumpster size, not a shrug. You also get the number rental pages bury: how much your debris weighs, how much weight your box actually includes, and what it costs per ton when you go over. For concrete, dirt and roofing the right answer is often a smaller box than the volume suggests, and this page will tell you when.

Data reviewed: August 2026. Figures here come from published sources and change over time. How we verify

Put this calculator on your website for free

Copy one snippet and give your visitors a working Dumpster Size Calculator.

How dumpster sizing actually works

Ask a rental company what size you need and you will get a good answer. Ask the internet and you will get a shrug wearing a blog post: it depends on your project, every job is different, call us for a quote. You came here for a number, so here is how this page gets you one.

A roll-off dumpster has two limits, and only one of them is printed on the side. The number in the name is cubic yards, which is space. The other limit is weight, it is measured in tons, it is included in your price up to a point, and past that point it is billed per ton after the truck crosses a certified scale. Nobody hides this exactly. It just tends to appear on page four of the rental agreement rather than in the sentence where they tell you what a 20 yard box costs.

So this page works out both. It estimates the volume of your debris from the project you are doing, estimates the weight from what that debris is made of, and then tells you which of the two limits you are going to hit first. For a garage full of old furniture it is the space. For a bathroom, a roof, or a patio it is almost always the weight, and by a lot.

Everything rounds up. You cannot rent 60 percent of a dumpster, and being one cubic yard short does not cost you one cubic yard. It costs you a second delivery, a second pickup, and a day you were not planning to spend on this.

The formula

volume = project size × a published or derived cubic-yards figure
weight = volume × pounds per cubic yard for that debris
roofing instead = squares × layers × pounds per square, plus felt and nails once
hauls = weight ÷ 20,000 lb legal truck limit, rounded UP (never below 1)
size = the smallest standard box that holds one haul's volume
overage = (weight per haul − included tons) × the per ton rate

Volume is cubic yards, and a cubic yard is a cube three feet on a side: about 6 contractor bags, or four tenths of a full size pickup bed. Included tons is the weight allowance bundled into your rental price, which runs 1 to 2 tons on a 10 or 15 yard box, 2 to 3 on a 20, 3 to 4 on a 30 and 4 to 5 on a 40. The 20,000 pound line is not a fee, it is a wall: it is what a roll-off truck may legally carry on a public road, and no size of container changes it.

Notice that the third line has nothing to do with cubic yards. That is the part of this business that surprises people, and it is why the honest answer for concrete, dirt, or a big tear-off is often a smaller box than the volume suggests, taken away and brought back.

Worked example

A full bathroom remodel, typical size, down to the studs.

Published guidance puts a full bathroom gut at 7 to 9 cubic yards once the tile, tub, vanity, toilet and drywall are out, so we use 8 cubic yards. Mixed construction debris runs about 500 pounds a cubic yard, so that is 4,000 pounds, or 2.00 tons (1.60 to 3.20 tons across the published density range). Eight cubic yards goes into the smallest box that holds it, which is a 10 yard dumpster, and it lands about 80 percent full.

Now the half of the answer that other pages stop short of. A 10 yard box includes 1 to 2 tons. Filled to the rim it therefore pays for debris up to about 300 pounds a cubic yard, and yours runs 500. At the midpoint of the allowance you are 0.50 tons over, which at the published 2026 overage rate of $50 to $150 a ton is $25 to $75 you did not budget for. On a rental that runs $250 to $500, that is the difference between a quote and a bill.

The fix is not a bigger box, because a bigger box mostly sells you space you were not going to use. The fix is one sentence on the phone: ask for 3.5 tons, which is the next half ton above the heavy end of the estimate. Say "I have 8 cubic yards of bathroom demolition, how much weight is included and what is the rate over that," and book whoever answers it clearly.

For scale while you are standing in the driveway: 8 cubic yards is about 3.2 pickup loads level full, or roughly 49 contractor bags, and a 10 yard box is about 12 feet long, 8 wide and 3.5 tall.

The weight trap, which is the whole point of this page

Here is the arithmetic that turns a vague warning into something you can act on. Take the included tonnage for each box, divide it by the box's cubic yards, and you get the heaviest debris that box can be filled to the rim with before you owe money. Using the middle of each published allowance:

Now compare that to what things actually weigh. Loose household junk and furniture is about 350 pounds a cubic yard. Yard waste is 550. Wood is 400. Mixed renovation debris is 500. Roofing shingles work out near 950. Broken concrete is 2,400 and dirt is 2,700.

Read those two lists together and the conclusion is blunt: a roll-off's included tonnage is priced for a box that is not full. Almost nothing you can put in a dumpster comes in under 300 pounds a cubic yard. That is not a scandal and it is not a trick, it is just how the product is priced, since disposal is charged to your hauler by the ton at the landfill and the rental is charged to you by the box. But it does mean the sentence "will it all fit" is the wrong question, and "how much weight is included" is the right one.

One oddity worth pointing at while we are here. A 15 yard box includes the same 1 to 2 tons as a 10 yard box while holding half again as much space, so those extra five cubic yards arrive with no extra weight allowance at all. If your debris is heavy, upgrading from a 10 to a 15 buys you room you cannot legally use. Upgrade for bulky and light, not for heavy.

What each size actually holds

Cubic yards mean nothing to most people, so here are the same boxes in units you can picture. A full size pickup bed is 8 feet by 5.33 by 1.5, which is 64 cubic feet, or 2.37 cubic yards level full. Call it 2.5 with a modest heap on top. A 33 gallon contractor bag is 4.41 cubic feet, so a cubic yard is about 6.1 bags.

Two honest notes on that list. The dimensions vary by hauler and by manufacturer, so treat them as planning figures for your driveway rather than specifications. And if you multiply them out you will find they do not agree with the cubic yard rating: 22 by 8 by 4.5 feet is 792 cubic feet, which is 29 cubic yards, on a box called a 20. The rating is the payload, the dimensions are the steel, and the walls, rails and floor sit outside the number you are buying. Do not plan on the arithmetic winning that argument at the curb.

Concrete, dirt, and the rule that surprises everyone

Concrete weighs 150 pounds a cubic foot, which is 4,050 pounds a solid cubic yard. That single number is the reason heavy debris has its own rules.

Take a 400 square foot patio poured 4 inches thick. In the ground that is 4.94 cubic yards. Break it up and it swells to about 8.33 cubic yards, because rubble stacks with air between the pieces. Weigh it and it is exactly 20,000 pounds, which is 10.00 tons, which is the legal limit for one roll-off truck. A four inch patio the size of a two car garage is precisely one truck load, to the pound, and it fits inside a 10 yard box with room to spare.

Now make it a 500 square foot patio. The volume says 10.4 cubic yards, which is a 15 yard box. The weight says 12.5 tons, which is not one truck at any size. The real answer is two hauls of a 10 yard box, and that is the shape of every heavy debris job: the right dumpster is smaller than the volume suggests, and it goes away and comes back. Many haulers have a dedicated heavy debris container for exactly this, a low sided box priced by the ton, and if you are moving concrete, brick, dirt or asphalt you should ask for one by name.

Three practical rules that come with it. Keep heavy debris clean and separate, because clean concrete often goes to a recycler at a much lower rate than mixed debris going to a landfill, and mixing one broken toilet into a load of concrete can reclassify the whole container. Expect a fill line, since plenty of companies will tell you to load a heavy box only halfway and mean it. And do not solve a weight problem by ordering a 30 yard box: you will fill a third of it, pay for all of it, and still be over.

Roofing, which is measured in squares and priced by the ton

Roofs get their own inputs on this page because roofers do not think in cubic yards. A square is 100 square feet of roof surface, so a 2,000 square foot roof is roughly 22 squares once you allow for pitch and overhangs. Layers matter just as much: two layers of shingle is two tear-offs, and you find out how many you have by looking at a cut edge at the eave and counting.

One square of tear-off takes about 0.4 cubic yards and weighs 225 pounds as 3-tab asphalt, 300 as architectural, 350 as wood shake, and 900 as slate or concrete tile. Add 75 pounds a square once, not once per layer, for felt, nails, flashing and the odd rotten sheet of decking, because those only come off the roof one time.

Run a normal job through that. A 25 square roof, single layer, architectural shingle: 10 cubic yards, 9,375 pounds, or 4.69 tons. It fits a 10 yard box on volume. The 10 yard box includes 1 to 2 tons. You are three tons over before you have swept the driveway. This is why a roofing dumpster is a conversation about weight and never about size, and why you should ask specifically what tonnage is included on a shingle-only load, since it is frequently different (and better) than the general rate.

Slate is a different animal again. Twenty-five squares of slate is 12.19 tons, which is two truck loads on a house where the same roof in asphalt is one. If your roof is slate or concrete tile, plan two hauls and tell the hauler before the tear-off starts.

What to sort out before you call

Where it will sit. The truck needs about 60 feet of straight approach to line up and lower a box, 10 to 12 feet of width to get in and out without collecting your fence, and 21 feet of overhead clearance. The clearance is the one that catches people: low branches, a power drop to the house, a basketball hoop, and the top of a garage door opening are all things that were not a problem until a truck arrived. Walk it and look up.

Protect the driveway. A loaded roll-off is heavier than anything else that will ever park there, and the wheels and rails can scar asphalt, especially in summer heat. Ask the company to set it on plywood, or lay a couple of sheets yourself. It costs almost nothing and it is the single most common regret in this whole transaction.

How long you get. A standard rental period is around 7 days in most markets, with extra days billed individually. If you are doing the work over two weekends, say so when you book rather than calling for an extension on day six.

Permits. On your own driveway you almost never need one. The moment the box sits on a public street, a sidewalk, or any public right of way, most municipalities require a permit, and permit conditions often add cones, reflective tape, or lights. Some rental companies will pull it for you and some will not, so ask, and ask early, because a permit office does not work at your pace.

What cannot go in it. Tires, wet paint and solvents, batteries of any kind, anything containing refrigerant (fridges, freezers, window air conditioners), asbestos, fuel, propane tanks, and medical waste. Mattresses and electronics are usually accepted as a surcharge item rather than banned outright. Dry latex paint in a sealed can is usually fine, and dry is the operative word. These are not fussy company rules: a forgotten propane tank is a fire at the transfer station, and a fridge with its refrigerant still in it is a federal problem for whoever tips the container. Ask the one question that covers all of it: what is on your prohibited list, and what do you charge for the things that are allowed but extra.

Load it low and flat. Nothing may sit above the top rail, because the driver has to tarp it and an untarpable load does not leave. Break down what breaks down, put the flat heavy things in first, and fill the corners. A box loaded badly can be 30 percent air, which is 30 percent of the money.

Rules of thumb, and the question each one is really answering

We read a lot of dumpster sizing pages to build this one. Several handy rules of thumb come up again and again, and every one of them is true of something. The trick is knowing which question each one answers, because a few of them answer the volume question when the thing that will actually decide your bill is the weight. Here is our working, since a rental company might well be embedding this calculator on its own site.

"A 20 yard dumpster holds 40 to 50 squares of shingles." By volume that is exactly right, at about 0.4 cubic yards a square. By weight those same shingles are 7.5 to 9.4 tons in a box whose included allowance is 2 to 3, and they crowd the 10 ton legal limit for the truck. So the volume answer is 40 to 50, and the answer that keeps your invoice flat is about 13 squares of architectural tear-off. Both are real numbers about the same box. Only one of them shows up on the bill.

"Roofing shingles weigh 2,400 to 2,600 pounds a cubic yard." That is the density of shingles stacked tight with the air pressed out, which is a genuinely useful figure for a pallet on a truck. A dumpster does not fill that way: tear-off goes in loose, in broken pieces, at angles. Counted per square as it actually lands, an architectural tear-off works out to roughly 940 pounds a cubic yard. Same material, different packing, and the packing is what your container sees.

"A 20 yard dumpster is 6 pickup truck loads." That works out to a bed holding 3.33 cubic yards. A full size 8 foot bed measures 8 by 5.33 by 1.5 feet, which is 64 cubic feet, or 2.37 cubic yards level full, so the rule is picturing a heaped bed rather than a level one. Level full, the figure is 8 loads, and 8 is the one to plan your weekend around.

"Divide your deck's square footage by 15." There are two conventions in circulation, one dividing by 15 and one by 50, and on a 300 square foot deck they give 20 cubic yards and 6. That gap is really a question about how you demolish: boards pulled up whole trap a lot of air, boards cut down as you go stack tight. So we worked it from the wood instead. A 20 by 15 deck holds roughly 64 cubic feet of actual lumber across decking, joists, beams, posts and railing, which is 2.4 cubic yards solid, and full length boards thrown in whole carry three to four times that in air. That puts a 300 square foot deck at 7 to 10 cubic yards. We quote the top of that range; if you cut as you go, you will land nearer the bottom.

One more that surprised us. The EPA publishes a volume-to-weight conversion table for construction and demolition debris, updated April 2016, and a lot of waste reporting runs on it. It puts concrete at 860 pounds a cubic yard and roofing at 731. Those figures trace to a 2006 California waste characterization study and they describe material as sorted for a study, not as loaded into a roll-off. Solid concrete is 4,050 pounds a cubic yard and broken concrete in a container is about 2,400. Size a container from the federal table and you would be under by nearly three times. It is an excellent table answering a different question, which is exactly why we do not use it here.

Sources

Where the numbers on this page come from. We go to the body that publishes the figure, not to another calculator. Figures on this page were checked against these sources in August 2026. See how we verify.

Frequently asked questions

What size dumpster do I need for a bathroom remodel?

A 10 yard dumpster for a typical full bathroom taken down to the studs, which runs about 8 cubic yards of debris. A powder room needs half that and still gets a 10 yard, since nothing smaller is standard. The catch is weight, not space: 8 cubic yards of bathroom demolition is about 2 tons and a 10 yard box includes 1 to 2, so ask for 3.5 tons of allowance when you book. Tile and a cast iron tub are what push it over.

How much does a 20 yard dumpster hold?

Twenty cubic yards, which is about 8 full size pickup loads level full or roughly 122 contractor bags. In project terms that is a kitchen tear-out or most of a two bedroom cleanout. It is usually around 22 feet long, 8 feet wide and 4.5 feet tall, and it includes 2 to 3 tons of weight. That last figure is the one that matters: filled to the rim a 20 yard box only pays for debris up to about 250 pounds a cubic yard, and almost everything weighs more than that.

What happens if I go over the weight limit?

Your load is weighed at a certified scale after pickup and you are billed per ton over the included tonnage, typically $50 to $150 a ton in 2026 depending on what your local landfill charges. It is a real charge rather than a penalty, and it shows up after the box is gone. Two ways to avoid the surprise: tell your rental company what the debris actually is and buy extra tonnage at booking, which is normally cheaper than the overage rate, or split a heavy load across two hauls. What you cannot do is exceed the truck's legal limit of about 10 tons, since that load simply will not be taken.

What can I not put in a dumpster?

Tires, wet paint and solvents, batteries of any kind, anything with refrigerant in it such as fridges, freezers and window air conditioners, asbestos, fuel, propane tanks and medical waste. Mattresses and electronics are usually allowed as a surcharge item rather than banned. Dry latex paint in a sealed can is generally fine, and dry is the operative word. Ask your hauler for their prohibited list and their surcharge list in the same phone call, because the second one is where the unexpected money is.

What size dumpster do I need for a roof tear-off?

Count squares, not square feet: a square is 100 square feet of roof, so a 2,000 square foot roof is about 22 squares. A 25 square single layer architectural tear-off is 10 cubic yards and weighs about 4.7 tons, which fits a 10 yard box on space and blows past its 1 to 2 ton allowance on weight. Order for the weight. Two layers doubles it. Slate or concrete tile at 900 pounds a square makes the same roof a two truck job, so say so before the tear-off starts.

Can I put concrete in a dumpster?

Yes, but in a small one, and often in a dedicated heavy debris box. Concrete is 4,050 pounds a solid cubic yard, so a 400 square foot patio 4 inches thick weighs exactly 20,000 pounds, which is the legal limit for one roll-off truck. Anything larger is more than one haul no matter what size container you order. Keep it clean and separate from other debris, because clean concrete often goes to a recycler at a much lower rate than mixed debris going to a landfill, and expect the hauler to give you a fill line and mean it.

Do I need a permit for a dumpster?

Almost never on your own driveway, and usually yes the moment it sits on a public street, sidewalk or right of way. Permit conditions often add requirements such as cones, reflective tape or lights. Some rental companies pull the permit for you and some do not, so ask when you book rather than the day before delivery, because a permit office runs at its own speed. Check with your HOA too, since plenty of them have their own rules about how long a container can sit and when it may be delivered.

How long do you get a dumpster for?

About 7 days is the standard rental period in most markets, with extra days billed individually. If your work spans two weekends, book the longer period up front rather than calling for an extension partway through, because availability, not price, is what runs out first in the busy season. Delivery also needs about 60 feet of straight approach, 10 to 12 feet of width and 21 feet of overhead clearance, so walk the route and look up before delivery day.

Related calculators